SAP Management of Change
Operational Risk Management
Stand Mai 2012
SAP Management of Change - Operational Risk Management Stand Mai 2012
Disclaimer

The information in this document is confidential and proprietary to SAP and may not be
disclosed without the permission of SAP. This document is not subject to your license
agreement or any other service or subscription agreement with SAP. SAP has no obligation to
pursue any course of business outlined in this document or any related presentation, or to
develop or release any functionality mentioned therein. This document, or any related
presentation and SAP's strategy and possible future developments, products and or platforms
directions and functionality are all subject to change and may be changed by SAP at any time
for any reason without notice. The information on this document is not a commitment, promise
or legal obligation to deliver any material, code or functionality. This document is provided
without a warranty of any kind, either express or implied, including but not limited to, the
implied warranties of merchantability, fitness for a particular purpose, or non-infringement. This
document is for informational purposes and may not be incorporated into a contract. SAP
assumes no responsibility for errors or omissions in this document, except if such damages
were caused by SAP intentionally or grossly negligent.
All forward-looking statements are subject to various risks and uncertainties that could cause
actual results to differ materially from expectations. Readers are cautioned not to place undue
reliance on these forward-looking statements, which speak only as of their dates, and they
should not be relied upon in making purchasing decisions.
Constrains: SAP has no legal obligation to deliver any material, code or functionality
and the project/topic may be changed by SAP at any time for any reason without notice.

© 2012 SAP AG. All rights reserved.                                                 Customer    2
SAP Management of Change - Operational Risk Management Stand Mai 2012
Operational Risk Management (ORM)
    Gewährleistung eines kontinuierlichen, reibungslosen Betriebs einer Anlage

           OPERATIONAL                                   RISK                MANAGEMENT

    Fokussierung auf:                      Unfälle reduzieren:       kontinuierliche Durchführung:
•   ständig informierte Mitarbeiter • Menschen                   •   Management Systeme
•   effiziente Abläufe                     •   Umwelt            •   proaktive Risikominimierung
•   betriebliche Kontinuität               •   Anlagen           •   kontinuierliche Verbesserung

      Ein effektiver, geschlossener ORM Prozess gewährleistet eine betriebliche
      Kontinuität durch proaktive Risikoidentifizierung und damit eine Reduzierung
      von unerwünschten Ereignissen

     © 2012 SAP AG. All rights reserved.                                                 Customer   3
SAP Management of Change - Operational Risk Management Stand Mai 2012
Notwendige Änderungen können ungeahnte Folgen haben

   Unkontrollierte Änderungen an der Anlage können
                                                          Aufgrund tragischer Ereignisse, wie die
    neue Sicherheitsfragen aufwerfen, führen zu        Katastrophen von Seveso oder z.B. Bhopal, ist
    Fehlinvestitionen und können kostspielige                 man bemüht bei Umbauarbeiten,
    Ausfallzeiten, mit viel Nacharbeit erwirken        Produktänderungen und bei der Instandhaltung
                                                           notwendige Prozesse zu verbessern

   Komplizierte Änderungsprozesse verleiten dazu,
    Änderungen ohne Überprüfungen und evtl.
    Genehmigungen durchzuführen

   Einbeziehung von Fachexperten, Genehmigern und
    dem technischen Personal ist zeitaufwändig und
    fehleranfällig

   Follow-up Aktionen gehen oft „unter“ oder werden
    nicht vollendet, temporäre Änderungen bleiben
    ungewollt dauerhaft liegen
                                                          Management of Change wurde z.B. in die
   Änderungen werden inkonsequent gehandhabt.         Vorschrift OSHA 1910.119 (USA) (bei uns Richtl.
                                                         96/82/EG (Seveso-II)) überführt. Diese und
    Beim Auftreten von Problemen, sind diese schwer     weitere darin enthaltenen Standards sollen den
    zurückzuverfolgen                                       reibungslosen Betriebsablauf erhöhen

© 2012 SAP AG. All rights reserved.                                                  Customer       4
SAP Management of Change - Operational Risk Management Stand Mai 2012
Business Case für Management of Change Process
Verbesserung – Reduzierung von Kosten und Risiken

                                                    Verantwortliches Management mit einbeziehen und
                                                     Aufgabenverwaltung vorantreiben
                                      Kosten        Verzögerungen minimieren und kostenspielige
                                      senken         Nacharbeiten vermeiden
                                                    Bestellungen unnötiger Bauteile/Ersatzteile vermeiden

                                                    Einheitliche Risikobewertung und
                                      Risiken        Zulassungsabwicklung
                                      mindern       Systemgesteuerte fachkundige Beratung
                                                    Revisionssichere Checklisten und Statuskontrolle

       Business Value                               Kontinuierlich geprüfte Prozesse bei
          fördern                     Chancen        Anlagenänderungen, ohne zusätzliche Risiken
                                      steigern      „leben‟ einer Sicherheitskultur und dadurch die
                                                     Anlagenproduktivität verbessern

                   Unternehmensweite Umsetzung einer wirksamen Sicherheitskultur

© 2012 SAP AG. All rights reserved.                                                      Customer      5
SAP Management of Change - Operational Risk Management Stand Mai 2012
Operational Risk Management improves Environment, Health, and Safety
performance by proactively managing risk to run more safely and efficiently

                                                           EHS                                                                                       Maintenance
                        Incident        EHS Risk                            Audit                   Management
                                                         Program                                                                                       Worker
                         Mgmt          Assessment                           Mgmt                     of Change
                                                          Mgmt                                                                                         Safety

Management/                               Establish                        Endorse
                       Visibility of                     Visibility of                                        Visibility                                Visibility of
                                       risk tolerance                    improvements
Executive               trends &                          trends &                                            of trends                                  trends &
                                              &                                &
Team                      KPIs                              KPIs                                               & KPIs                                      KPIs
                                       monitor results                   monitor results

EHS                    Process &         Identify &      HSM & IH &         Plan &                                                                        Assign
                       investigate        analyze           OH              conduct                                                                      risks &
                         incident           risks        management          audits                                                                      controls

                                                                                                                        Assess & approve
                                                                                                               change
Operations

                                                                                                                                                                        Manage control of
                                          Control,                        Implement

                                                                                                    Request

                                                                                                                                           Execute
                                                                                           change

                                                                                                                                           change
                         Record           monitor                          corrective

                                                                                                                                                                             work
                         incident         risks &                              &
                                           reduce                          preventive
Maintenance                                 risks                           actions                                                                    Plan work

                                                                                                                                                        Execute
                                                                                                                                                         work

© 2012 SAP AG. All rights reserved.                                                                                                                  Customer                  6
SAP Management of Change - Operational Risk Management Stand Mai 2012
Systemübersicht

            Management of Change = eigenständiges System mit und ohne ERP Anbindung

                                                SAP Management of Change 1.0

                                                     SAP NetWeaver 7.31

                                                      SAP ERP 604
                                                                                                          Andere Systeme
      SAP ERP 600

Optional:
Bereitstellen des Management of Change zusammen mit bestehenden ERP Systemen (Minimum SAP NW 7.31 ist erforderlich)

© 2012 SAP AG. All rights reserved.                                                                           Customer     7
SAP Management of Change - Operational Risk Management Stand Mai 2012
Anwendungskomponenten

                                                                 MOC 100
                                                           (Management of Change 100)

                                                                  IAM 100
                                                        (Issue and Activity Management 100)

                                                    BS_FND 731 + WEBCUIF
                                             (Business Suite Foundation 731 + Web Client UI Framework)

                                      Business Object Processing Framework (BOBF)
                                      Floorplan Manager BOBF Integration (FBI)
                                      Business Object Layer (BOL)

                                                                   NW 731
                                                                 (NetWeaver 731)

                                      Business Rules Framework Plus (BRF+)
                                      Business Workflow
                                      Digital Signature
                                      Status and Action Management (S&AM)
                                      Floorplan Manager (FPM)
                                      Personal Object Worklist (POWL)
                                      Operational Data Provider (ODP)

© 2012 SAP AG. All rights reserved.                                                                      Customer   8
SAP Management of Change - Operational Risk Management Stand Mai 2012
Typischer Änderungsprozess mit Phasen
• Änderung beschreiben, Dokumente und                Ausfüllen des
  dazugehörige Objekte anfügen                   Änderungsanfrageformulars
                                                      und Einreichung
• Fragebögen für die Kategorisierung und
                                               Vollständigkeitsprüfung und
                                                                                                      Änderung anfragen
  erste Risikobewertung ausfüllen
                                               Genehmigung des Antrages
• Änderungen als dauerhaft /
  vorübergehend, vorrangig/nebensächlich,       Überprüfe MoC Relevanz
  oder als eine Notfalländerung definieren

• Bewertungsvorgehensweisen planen und
                                               Vor-der-Änderung review #1
  zuweisen mit Checklisten und/oder
  Fragebögen
                                                                                    Genehmigt?         vor der Änderung
                                               Vor-der-Änderung review #n
• Automatische Email Benachrichtigungen

•   Aufgaben festlegen und zuweisen           Fortführen mit Umsetzung der
•   Automatische Email Benachrichtigung                  Änderung
•   Track-Status
•   Informationen von Stakeholders
                                                      Aufgaben #1-n                                           Umsetzung
• Genehmiger beauftragen                                                            Fertiggestellt?
• Automatische Email Benachrichtigung                                                Genehmigt?
• Elektronische Unterschift aktivieren              Bewertungen #1-n

                                                  Änderung is vollzogen                               vor „hand over‟ an
                                                                                                                 Betrieb
                                                Pre-start-up Bewertung #1            Genehmigt?

                                                          Go Live
                                             Überprüfen auf Vollständigkeit aller
                                                Aktivitäten und Dokumenten
                                              updates & auf Aktualisierung aller                         Akte schließen
                                                         Dokumente
       © 2012 SAP AG. All rights reserved.             Akte Ablegen                                      Customer   9
SAP Management of Change - Operational Risk Management Stand Mai 2012
Allgemeiner Ablauf mit Rollen eines Veränderungsprozesses

                                                                                                Änderungsanfrage
  Änderungsanfrage                            Review und                                          freigeben und              Ausführende
                                                                        Genehmigung
     einreichen                               Auswertung                                        Änderungsprozess             Maßnahmen
                                                                                                     antreiben

        Antragsteller                          Gutachter                 Genehmiger                 Koordinator           Maßnahmenleiter
   Person die den                          Fachpersonal oder         Dienstvorgesetzte       Person, die die Änderung    Genehmiger, Gutachter,
Änderungsantrag stellt                                                                       verwaltet und vorantreibt       Task-Besitzer
                                           Dienstvorgesetzte           oder Manager

      Änderungsanfrage                    Vollständigkeit der      Vollständigkeit der    Anfrage veröffentlichen     Maßnahmen
      erstellen                             Anfrage überprüfen        Anfrage überprüfen                                   ausführen in Teams
                                                                                             Einige Maßnahmen
                                                                                                                           oder einzeln:
      Änderung                         Anfrage bearbeiten          Anfrage bearbeiten      werden automatisch
      beschreiben                        um Input zu                  um Input zu             vorgeschlagen               Prüfung
                                         verbessern                   verbessern
      Anhang anfügen                                                                        Angemessene                 Genehmigung
                                           Entscheiden ob           Entscheiden ob          Maßnahmenhierarchie,
  Flexible Fragebögen                                                                                                    Aufgaben/Tasks
                                            Anfrage plausibel ist     Anfrage                 Zeitachse und
   ausfüllen
                                                                      prozessrelevant ist     Maßnahmenleiter             Maßnahmen können
                                        Änderungsanfrage an
                                                                                              definieren                   Checklisten oder
                                         Genehmiger                  Änderungsanfrage
                                                                                                                           Fragebögen
                                         weiterleiten                 ablehnen wenn nicht       Maßnahmen in
                                                                                                                           beinhalten
                                                                      relevant                  definierter Abfolge
                                                                                                ansteuern
                                                                                                Änderungsanfrage
                                                                                                abschließen wenn alle
                                                                                                Maßnahmen
                                                                                                vervollständigt wurden

     © 2012 SAP AG. All rights reserved.                                                                                    Customer         10
Allgemeiner Ablauf mit Rollen eines Veränderungsprozesses

                                                                                                Änderungsanfrage
  Änderungsanfrage                            Review und                                          freigeben und              Ausführende
                                                                        Genehmigung
     einreichen                               Auswertung                                        Änderungsprozesse            Maßnahmen
                                                                                                     antreiben

        Antragsteller                          Gutachter                 Genehmiger                 Koordinator           Maßnahmenleiter
   Person die den                          Fachpersonal oder         Dienstvorgesetzte       Person, die die Änderung    Genehmiger, Gutachter,
Änderungsantrag stellt                                                                       verwaltet und vorantreibt       Task-Besitzer
                                           Dienstvorgesetzte           oder Manager

      Änderungsanfrage                    Vollständigkeit der      Vollständigkeit der    Anfrage veröffentlichen     Maßnahmen
      erstellen                             Anfrage überprüfen        Anfrage überprüfen                                   ausführen in Teams
                                                                                             Einige Maßnahmen
                                                                                                                           oder einzeln:
      Änderung                         Anfrage bearbeiten          Anfrage bearbeiten      werden automatisch
      beschreiben                        um Input zu                  um Input zu             vorgeschlagen               Prüfung
                                         verbessern                   verbessern
      Anhang anfügen                                                                        Angemessene                 Genehmigung
                                           Entscheiden ob           Entscheiden ob          Maßnahmenhierarchie,
  Flexible Fragebögen                                                                                                    Aufgaben/Tasks
                                            Anfrage plausibel ist     Anfrage                 Zeitachse und
   ausfüllen
                                                                      prozessrelevant ist     Maßnahmenleiter             Maßnahmen können
                                        Änderungsanfrage an
                                                                                              definieren                   Checklisten oder
                                         Genehmiger                  Änderungsanfrage
                                                                                                                           Fragebögen
                                         weiterleiten                 ablehnen wenn nicht       Maßnahmen in
                                                                                                                           beinhalten
                                                                      relevant                  definierter Abfolge
                                                                                                ansteuern
                                                                                                Änderungsanfrage
                                                                                                abschließen wenn alle
                                                                                                Maßnahmen
                                                                                                vervollständigt wurden

     © 2012 SAP AG. All rights reserved.                                                                                    Customer         11
Anlegen einer Änderungsanfrage – Objektinformation und
Definition der Änderung

© 2012 SAP AG. All rights reserved.            Customer   12
Anlegen einer Änderungsanfrage – Referenzen &
Checklisten
  Zugehörige Objektinformationen aus einem evtl. Backend-System
  Einfache Handhabung von Anhängen und Links
  Fragebögen und Checklisten können an kundenspezifische Prozesse integriert werden

© 2012 SAP AG. All rights reserved.                                                    Customer   13
Weitere Objekte

 Zusätzlich, vorhandene Objekte können durch Change Request – Typ verwaltet werden

© 2012 SAP AG. All rights reserved.                                                   Customer   14
Anlegen einer Änderungsanfrage – Schnelleinstieg!

                                       Änderungsanfrage erstellen mit Hilfe einer vereinfachten Abfrage

© 2012 SAP AG. All rights reserved.                                                                        Customer   15
Einfaches Anfügen relevanter Anlagen

© 2012 SAP AG. All rights reserved.    Customer   16
Verzeichnisse, Dateien und Links als Anlagen

 Unterstützte Dateitypen werden im Customizing verwaltet

                                                                 Demo

© 2012 SAP AG. All rights reserved.                         Customer   17
Allgemeiner Ablauf mit Rollen eines Veränderungsprozesses

                                                                                                 Änderungsanfrage
  Änderungsanfrage                            Review und                                           freigeben und             Ausführende
                                                                        Genehmigung
     einreichen                               Auswertung                                         Änderungsprozess            Maßnahmen
                                                                                                      antreiben

        Antragsteller                          Gutachter                 Genehmiger                 Koordinator           Maßnahmenleiter
   Person die den                          Fachpersonal oder         Dienstvorgesetzte       Person, die die Änderung    Genehmiger, Gutachter,
Änderungsantrag stellt                                                                       verwaltet und vorantreibt       Task-Besitzer
                                           Dienstvorgesetzte           oder Manager

      Änderungsanfrage                    Vollständigkeit der      Vollständigkeit der    Anfrage veröffentlichen     Maßnahmen
      erstellen                             Anfrage überprüfen        Anfrage überprüfen                                   ausführen in Teams
                                                                                             Einige Maßnahmen
                                                                                                                           oder einzeln:
      Änderung                         Anfrage bearbeiten          Anfrage bearbeiten      werden automatisch
      beschreiben                        um Input zu                  um Input zu             vorgeschlagen               Prüfung
                                         verbessern                   verbessern
      Anhang anfügen                                                                        Angemessene                 Genehmigung
                                           Entscheiden ob           Entscheiden ob          Maßnahmenhierarchie,
  Flexible Fragebögen                                                                                                    Aufgaben/Tasks
                                            Anfrage plausibel ist     Anfrage                 Zeitachse und
   ausfüllen
                                                                      prozessrelevant ist     Maßnahmenleiter             Maßnahmen können
                                        Änderungsanfrage an
                                                                                              definieren                   Checklisten oder
                                         Genehmiger                  Änderungsanfrage
                                                                                                                           Fragebögen
                                         weiterleiten                 ablehnen wenn nicht       Maßnahmen in
                                                                                                                           beinhalten
                                                                      relevant                  definierter Abfolge
                                                                                                ansteuern
                                                                                                Änderungsanfrage
                                                                                                abschließen wenn alle
                                                                                                Maßnahmen
                                                                                                vervollständigt wurden

     © 2012 SAP AG. All rights reserved.                                                                                    Customer         18
Review & Auswertung ohne vordefinierte Aktivitäten

 Prüfer analysieren eingereichte Änderungsanfragen und liefern Feedback
 Ist die bereitgestellte Information nicht ausreichend, kann der Prüfer den Änderungsantrag
  zurücksenden und zusätzliche Information anfordern
 Nach Vervollständigung der Berichte werden diese zum Genehmigungsprozedere weitergeleitet

© 2012 SAP AG. All rights reserved.                                                       Customer   19
Review & Auswertung mit vordefinierten Aktivitäten

   Gutachter erhalten vordefinierte Aktivitäten, um eine bestimmte Prüfung / Evaluierung
    durchzuführen
   Ergibt eine bessere Übersicht über das Gesamtvorhaben mit Einzelaktivitäten
   Reichen die bereitgestellten Informationen nicht aus, kann der Gutachter den Änderungsantrag an
    den Anforderer zurücksenden um weitere Informationen zu erhalten
   Nach vollständiger Prüfung, werden die Anträge zum Genehmigungsprozedere weitergeleitet

© 2012 SAP AG. All rights reserved.                                                         Customer   20
Frage Sie den Experten - Funktion

  Auflistung „Experte‟ kann durch „Business Rule Framework‟ (BRF+) gepflegt sein
  Auflistung „Experte‟ kann auch durch Change Request Typ gepflegt sein
  Email an den „Experten‟ enthält den Link zum Änderungsantrag

© 2012 SAP AG. All rights reserved.                                                 Customer   21
Allgemeiner Ablauf mit Rollen eines Veränderungsprozesses

                                                                                                 Änderungsanfrage
  Änderungsanfrage                            Review und                                           freigeben und             Ausführende
                                                                        Genehmigung
     einreichen                               Auswertung                                         Änderungsprozess            Maßnahmen
                                                                                                      antreiben

        Antragsteller                          Gutachter                 Genehmiger                Koordinator            Maßnahmenleiter
   Person die den                          Fachpersonal oder         Dienstvorgesetzte       Person, die die Änderung    Genehmiger, Gutachter,
Änderungsantrag stellt                                                                       verwaltet und vorantreibt       Task-Besitzer
                                           Dienstvorgesetzte           oder Manager

      Änderungsanfrage                    Vollständigkeit der      Vollständigkeit der    Anfrage veröffentlichen     Maßnahmen
      erstellen                             Anfrage überprüfen        Anfrage überprüfen                                   ausführen in Teams
                                                                                             Einige Maßnahmen
                                                                                                                           oder einzeln:
      Änderung                         Anfrage bearbeiten          Anfrage bearbeiten      werden automatisch
      beschreiben                        um Input zu                  um Input zu             vorgeschlagen               Prüfung
                                         verbessern                   verbessern
      Anhang anfügen                                                                        Angemessene                 Genehmigung
                                           Entscheiden ob           Entscheiden ob          Maßnahmenhierarchie,
  Flexible Fragebögen                                                                                                    Aufgaben/Tasks
                                            Anfrage plausibel ist     Anfrage                 Zeitachse und
   ausfüllen
                                                                      prozessrelevant ist     Maßnahmenleiter             Maßnahmen können
                                        Änderungsanfrage an
                                                                                              definieren                   Checklisten oder
                                         Genehmiger                  Änderungsanfrage
                                                                                                                           Fragebögen
                                         weiterleiten                 ablehnen wenn nicht       Maßnahmen in
                                                                                                                           beinhalten
                                                                      relevant                  definierter Abfolge
                                                                                                ansteuern
                                                                                                Änderungsanfrage
                                                                                                abschließen wenn alle
                                                                                                Maßnahmen
                                                                                                vervollständigt wurden

     © 2012 SAP AG. All rights reserved.                                                                                    Customer         22
Genehmigung

  Genehmiger überprüft die vollständige Änderungsanfrage und entscheidet ob Änderungen notwendig sind
  Ist die bereitgestellte Information nicht ausreichend, kann der Genehmiger den Änderungsantrag
   zurücksenden und zusätzliche Infromation anfordern
  Falls erforderlich weist der Genehmiger dem entsprechenden Änderungsantrag einen weiteren Koordinator
   oder Gutachter zu

© 2012 SAP AG. All rights reserved.                                                            Customer    23
Genehmigungsprozess mit Digitaler Signatur

  Genehmigung durch digitale Signatur
  Mehrere Genehmiger können digital signieren
  Anpassbare digitale Signatur
  Anpassbare, digitale Signaturen in jeder Statusänderung des Änderungsantrages und Maßnahmen
   definierbar

                                                                                         Demo

© 2012 SAP AG. All rights reserved.                                                      Customer   24
Allgemeiner Ablauf mit Rollen eines Veränderungsprozesses

                                                                                                Änderungsanfrage
  Änderungsanfrage                            Review und                                          freigeben und              Ausführende
                                                                        Genehmigung
     einreichen                               Auswertung                                        Änderungsprozess             Maßnahmen
                                                                                                     antreiben

        Antragsteller                          Gutachter                 Genehmiger                Koordinator            Maßnahmenleiter
   Person die den                          Fachpersonal oder         Dienstvorgesetzte      Person, die die Änderung     Genehmiger, Gutachter,
Änderungsantrag stellt                                                                      verwaltet und vorantreibt        Task-Besitzer
                                           Dienstvorgesetzte           oder Manager

      Änderungsanfrage                    Vollständigkeit der      Vollständigkeit der    Anfrage veröffentlichen     Maßnahmen
      erstellen                             Anfrage überprüfen        Anfrage überprüfen                                   ausführen in Teams
                                                                                             Einige Maßnahmen
                                                                                                                           oder einzeln:
      Änderung                         Anfrage bearbeiten          Anfrage bearbeiten      werden automatisch
      beschreiben                        um Input zu                  um Input zu             vorgeschlagen               Prüfung
                                         verbessern                   verbessern
      Anhang anfügen                                                                        Angemessene                 Genehmigung
                                           Entscheiden ob           Entscheiden ob          Maßnahmenhierarchie,
  Flexible Fragebögen                                                                                                    Aufgaben/Tasks
                                            Anfrage plausibel ist     Anfrage                 Zeitachse und
   ausfüllen
                                                                      prozessrelevant ist     Maßnahmenleiter             Maßnahmen können
                                        Änderungsanfrage an
                                                                                              definieren                   Checklisten oder
                                         Genehmiger                  Änderungsanfrage
                                                                                                                           Fragebögen
                                         weiterleiten                 ablehnen wenn nicht       Maßnahmen in
                                                                                                                           beinhalten
                                                                      relevant                  definierter Abfolge
                                                                                                ansteuern
                                                                                                Änderungsanfrage
                                                                                                abschließen wenn alle
                                                                                                Maßnahmen
                                                                                                vervollständigt wurden

     © 2012 SAP AG. All rights reserved.                                                                                    Customer         25
Veröffentlichen der Änderungsanforderung nach Freigabe

   Koordinator veröffentlicht den Änderungsantrag
   Durch die Freigabe wird das Business Rules Framework im Hintergrund der Abläufe aktiviert um
    zusätzliche Business Partner und/oder Maßnahmen zu finden/ bestimmen

© 2012 SAP AG. All rights reserved.                                                     Customer   26
Ausführungsphase

 Koordinator prüft die Maßnahmen und führt bei Bedarf zusätzliche Maßnahmen ein

© 2012 SAP AG. All rights reserved.                                                Customer   27
Weitere Maßnahmen aus Vorlage einfügen

  wählt eine Maßnahme aus der Vorlage

© 2012 SAP AG. All rights reserved.      Customer   28
Maßnahmen manuell ohne Vorlagen hinzufügen

 Maßnahmen werden zum Maßnahmenstamm hinzugefügt

© 2012 SAP AG. All rights reserved.                 Customer   29
Allgemeiner Ablauf mit Rollen eines Veränderungsprozesses

                                                                                                 Änderungsanfrage
  Änderungsanfrage                            Review und                                           freigeben und             Ausführende
                                                                        Genehmigung
     einreichen                               Auswertung                                         Änderungsprozess            Maßnahmen
                                                                                                     fantreiben

        Antragsteller                          Gutachter                 Genehmiger                Koordinator            Maßnahmenleiter
   Person die den                          Fachpersonal oder         Dienstvorgesetzte       Person, die die Änderung    Genehmiger, Gutachter,
Änderungsantrag stellt                                                                       verwaltet und vorantreibt       Task-Besitzer
                                           Dienstvorgesetzte           oder Manager

      Änderungsanfrage                    Vollständigkeit der      Vollständigkeit der    Anfrage veröffentlichen     Maßnahmen
      erstellen                             Anfrage überprüfen        Anfrage überprüfen                                   ausführen in Teams
                                                                                             Einige Maßnahmen
                                                                                                                           oder einzeln:
      Änderung                         Anfrage bearbeiten          Anfrage bearbeiten      werden automatisch
      beschreiben                        um Input zu                  um Input zu             vorgeschlagen               Prüfung
                                         verbessern                   verbessern
      Anhang anfügen                                                                        Angemessene                 Genehmigung
                                           Entscheiden ob           Entscheiden ob          Maßnahmenhierarchie,
  Flexible Fragebögen                                                                                                    Aufgaben/Tasks
                                            Anfrage plausibel ist     Anfrage                 Zeitachse und
   ausfüllen
                                                                      prozessrelevant ist     Maßnahmenleiter             Maßnahmen können
                                        Änderungsanfrage an
                                                                                              definieren                   Checklisten oder
                                         Genehmiger                  Änderungsanfrage
                                                                                                                           Fragebögen
                                         weiterleiten                 ablehnen wenn nicht       Maßnahmen in
                                                                                                                           beinhalten
                                                                      relevant                  definierter Abfolge
                                                                                                ansteuern
                                                                                                Änderungsanfrage
                                                                                                abschließen wenn alle
                                                                                                Maßnahmen
                                                                                                vervollständigt wurden

     © 2012 SAP AG. All rights reserved.                                                                                    Customer         30
Abarbeiten von Maßnahmen

 Verantwortlicher der Maßnahme erhalten Zugriff auf ihre Aktivitäten per E-Mail und / oder aus der
  Arbeitsauflistung

© 2012 SAP AG. All rights reserved.                                                             Customer   31
Maßnahmenübersicht

  Maßnahmen können Teilmaßnahmen beinhalten
  Referenz-/Literaturangaben mit Anhang-Funktionalität
  Tabellen der an der Maßnahme beteiligten Personen
  Status Log (Soll-/Istvergleich)

© 2012 SAP AG. All rights reserved.                       Customer   32
Erstellen von Instandhaltungsmeldungen aus Maßnahmen

  Durch Drücken von "Create Main.Notification„ wird die IH-Störmeldung automatisch im Backend-
   System angelegt
  Erstellen von Instandhaltungsaufträgen wird ebenfalls unterstützt

© 2012 SAP AG. All rights reserved.                                                    Customer   33
Erstellen von Instandhaltungsmeldungen aus Maßnahmen

  Erstellte IH-Meldung wird automatisch in die zugehörige Objekttabelle der Maßnahme hinzugefügt
  Link navigiert direkt zur erstellten IH-Meldung im Backend System

© 2012 SAP AG. All rights reserved.                                                    Customer     34
Erstellte IH-Meldung im Backend System

  Backend System mit “Display Maintenance Notification” Transaktion
  Die Änderungsantrags- bzw. Änderungsmaßnahmendaten in der IH-Meldung / IH-Auftrag können in
   der BAdI-Implementierung bearbeitet werden

© 2012 SAP AG. All rights reserved.                                                Customer      35
Adobe Print Form für Änderungsantrag und Maßnahmen

  Standard Adobe Print Forms für Änderungsantrag und Maßnahmen/Untermaßnahmen im Lieferumfang
  Erstellung eigener Adobe Print Forms möglich

© 2012 SAP AG. All rights reserved.                                                   Customer   36
Auswertungen

   ‚Operational Data Provider (ODP), zur einfachen Anbindung an das bestehende Analytic-Tool (z.B
    SAP BusinessObject, SAP BI)

© 2012 SAP AG. All rights reserved.                                                     Customer     37
SAP Management of Change 1.0 - Funktionen

 MOC als eigenständiges- bzw. vom ERP Release Stand unabhängiges,          netzwerkbasierendes
      System basierend auf SAP NW 7.31

 Integration an klassische ERP Objekte (z.B. Technischer Platz, Equipment, Material,
      Dokumente, Instandhaltungsauftrag, IH-Meldung) und an das EHSM* Risk Assessment
                                                    (* SAP Environment, Health and Safety Management 3.0)
 Enterprise Service für ‘Anlegen einer Änderungsanfrage’
 SAP Business Workflow einschließlich Email-Benachrichtigung
 SAP Digital Signature – anpassbar für jede Statusänderung
 Einsatz ‘Business Rules Framework (BRF+)’ für flexibles definieren, kundenspezifischer
      Geschäftsprozesse

 Anpassbare, vordefinierte Fragebögen und Checklisten als Vorlagen
 Intuitive, einstellbare Benutzeroberflächen (WebDynpro)
 Adobe Print Form für Änderungsanfrage und Maßnahmen
 Einfach zu erweitern bzw. an ERP anzubinden
 Einfache Auswertemöglichkeiten über Operational Data Provider (ODP)
© 2012 SAP AG. All rights reserved.                                                      Customer     38
Vielen Dank!

Weitere Informationen:

                 Ralph Müller
                 Instandhaltung und Facility Management
                 SAP DeutschlandAG
                 Dietmar-Hopp-Allee 16
                 69190 Walldorf, Germany

                 T +49 6227 7 44620
                 F +49 6227 78-25145
                 M +49 160 889 6426
                 E ralph.mueller@sap.com
© 2012 SAP AG. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose     Google App Engine, Google Apps, Google Checkout, Google Data API, Google Maps,
without the express permission of SAP AG. The information contained herein may be               Google Mobile Ads, Google Mobile Updater, Google Mobile, Google Store, Google Sync,
changed without prior notice.                                                                   Google Updater, Google Voice, Google Mail, Gmail, YouTube, Dalvik and Android are
                                                                                                trademarks or registered trademarks of Google Inc.
Some software products marketed by SAP AG and its distributors contain proprietary
software components of other software vendors.                                                  INTERMEC is a registered trademark of Intermec Technologies Corporation.
Microsoft, Windows, Excel, Outlook, PowerPoint, Silverlight, and Visual Studio are              Wi-Fi is a registered trademark of Wi-Fi Alliance.
registered trademarks of Microsoft Corporation.
                                                                                                Bluetooth is a registered trademark of Bluetooth SIG Inc.
IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x,
System z, System z10, z10, z/VM, z/OS, OS/390, zEnterprise, PowerVM, Power                      Motorola is a registered trademark of Motorola Trademark Holdings LLC.
Architecture, Power Systems, POWER7, POWER6+, POWER6, POWER, PowerHA,                           Computop is a registered trademark of Computop Wirtschaftsinformatik GmbH.
pureScale, PowerPC, BladeCenter, System Storage, Storwize, XIV, GPFS, HACMP,
RETAIN, DB2 Connect, RACF, Redbooks, OS/2, AIX, Intelligent Miner, WebSphere, Tivoli,           SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP BusinessObjects Explorer,
Informix, and Smarter Planet are trademarks or registered trademarks of IBM Corporation.        StreamWork, SAP HANA, and other SAP products and services mentioned herein as well
                                                                                                as their respective logos are trademarks or registered trademarks of SAP AG in Germany
Linux is the registered trademark of Linus Torvalds in the United States and other countries.   and other countries.
Adobe, the Adobe logo, Acrobat, PostScript, and Reader are trademarks or registered             Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal
trademarks of Adobe Systems Incorporated in the United States and other countries.              Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services
Oracle and Java are registered trademarks of Oracle and its affiliates.                         mentioned herein as well as their respective logos are trademarks or registered trademarks
                                                                                                of Business Objects Software Ltd. Business Objects is an SAP company.
UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.
                                                                                                Sybase and Adaptive Server, iAnywhere, Sybase 365, SQL Anywhere, and other Sybase
Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin                products and services mentioned herein as well as their respective logos are trademarks or
are trademarks or registered trademarks of Citrix Systems Inc.                                  registered trademarks of Sybase Inc. Sybase is an SAP company.
HTML, XML, XHTML, and W3C are trademarks or registered trademarks of W3C®,                      Crossgate, m@gic EDDY, B2B 360°, and B2B 360° Services are registered trademarks
World Wide Web Consortium, Massachusetts Institute of Technology.                               of Crossgate AG in Germany and other countries. Crossgate is an SAP company.
Apple, App Store, iBooks, iPad, iPhone, iPhoto, iPod, iTunes, Multi-Touch, Objective-C,         All other product and service names mentioned are the trademarks of their respective
Retina, Safari, Siri, and Xcode are trademarks or registered trademarks of Apple Inc.           companies. Data contained in this document serves informational purposes only. National
                                                                                                product specifications may vary.
IOS is a registered trademark of Cisco Systems Inc.
                                                                                                The information in this document is proprietary to SAP. No part of this document may be
RIM, BlackBerry, BBM, BlackBerry Curve, BlackBerry Bold, BlackBerry Pearl, BlackBerry           reproduced, copied, or transmitted in any form or for any purpose without the express prior
Torch, BlackBerry Storm, BlackBerry Storm2, BlackBerry PlayBook, and BlackBerry App             written permission of SAP AG.
World are trademarks or registered trademarks of Research in Motion Limited.

 © 2012 SAP AG. All rights reserved.                                                                                                                               Customer             40
Sie können auch lesen